Since 2008, Orient Cable has delivered over 1,900KM submarine cables worldwide with voltage up to 220KV AC and +-200KV DC. The below are the featured installations
- The first 220KV submarine cable installation in China on 2010
Zhoushan-Dajiaoshan interconnection , 220KV,
20.7 km, 500mm.
- The other Ningbo Orient Submarine Cable Installations in latest years:
Project |
Voltage / Length/ OD |
Cable Description |
Year in operation |
ZhouShan Island Interconnection 1 |
64/110kV,102.9 kM, 1*500mm2 |
Submarine XLPE cable with optical fiber |
2012 |
Zhoushan island interconnection 2 |
127/220KV, 13.8 km, 1*500 mm2 |
Submarine XLPE cable |
2010 |
Zhoushan island interconnection 3 |
127/220kV, 6.9km, 1*500 mm2 |
Submarine XLPE cable with optical fiber |
2010 |
SiJiao Interconnection |
64/110kV, 34.4kM, 1*500mm2 |
Submarine XLPE cable with optical fiber |
2011 |
SiJiao Interconnection |
64/110kV, 68.5kM, 1*500mm2 |
Submarine XLPE cable |
2011 |
ShangXiaChuan Island Interconnection |
64/110kV, 30.293kM, 1*1000mm2 |
Submarine XLPE cable with optical fiber |
2010 |
NanRi Wind Farm |
64/110kV, 31.927kM, 1*300mm2 |
Submarine XLPE cable with optical fiber |
2009 |
ZhouShan HVDC island interconnection |
50kV, 3 km, 1*300 mm2 |
Submarine XLPE cable with optical fiber |
2009 |